Pando Electric, an innovator in electric vehicle charging, has been selected to install a comprehensive solution for the entire Woodland Creek Homeowners Association in East Palo Alto, California. Pando Electric’s integrated solution – combining hardware, software and service into a seamless ecosystem – will deliver smart and reliable charging to every property owner at the complex.
Pando Electric Delivers 100% EV Charging Coverage To Multi-Family Complex
Courtesy of Pando Electric

“With our focus on cost-savings, energy efficiency and user experience, Pando Electric is uniquely suited to meet the EV charging needs of multi-family properties, including condominium and apartment buildings,” states Aaron Li, CEO and Founder of Pando Electric.

“With our Woodland Creek HOA partnership, Pando Electric is delivering 100% EV charging coverage at 70% less cost: under $500 per station fully installed for every resident.”

Li notes demand for EV charging is growing rapidly among multifamily building residents: 70% consider it a highly desirable amenity (AutoPacific, December 2023). Yet property owners face significant challenges in implementing charging solutions due to limitations in existing electric panel capacity and the high costs traditionally associated with installation.

Pando Electric provides a powerful alternative: a universal, socket-based solution that streamlines set-up and utilizes existing 240-volt power. While installation costs are greatly reduced, EV owners experience high-speed Level-2 charging. In the case of the Woodland Creek HOA, these efficiencies led to the addition of more chargers.

“After meticulous research and competitive bidding, Pando Electric was our clear choice for installing EV chargers,” says Tom Herbst, a Woodland Creek HOA owner and head of their EV charging committee. “With their pricing, we were able to expand our scope from a few shared charging units to full building coverage.”

The Woodland Creek installation is being implemented in collaboration with Peninsula Clean Energy . The project covers three buildings and 90 condominium units, completed in three phases to best accommodate residents and leverage PCE incentives. Upon completion, Pando Electric will continue 24/7 support to both building managers and residents.

Additional benefits of Pando Electric: drivers connect using their own charging cable eliminating common “broken cord” issues; AI-enabled adaptive load management ensures optimal power management; and convenient online and mobile tools provide turnkey administration for building managers and drivers alike.

Baterías con premio en la gran feria europea del almacenamiento de energía
El jurado de la feria ees (la gran feria europea de las baterías y los sistemas acumuladores de energía) ya ha seleccionado los productos y soluciones innovadoras que aspiran, como finalistas, al gran premio ees 2021. Independientemente de cuál o cuáles sean las candidaturas ganadoras, la sola inclusión en este exquisito grupo VIP constituye todo un éxito para las empresas. A continuación, los diez finalistas 2021 de los ees Award (ees es una de las cuatro ferias que integran el gran evento anual europeo del sector de la energía, The smarter E).