The initial aim is the development of joint projects and the significant expansion of market shares in Germany, one of the largest and dynamically growing markets for geothermal power plants in Europe. Strabag has great expertise in the implementation of environmental technology systems of various types and sizes and has already built a turn-key geothermal power plant with ORC technology in Garching a. d. Alz for Silenos Energy GmbH.
“With the generation of climate-neutral and base load energy, we can make an extremely important contribution to the energy transition in this country” said Thomas Büchner, managing director of Strabag Umwelttechnik GmbH.
However, an expansion of the partnership to other markets, above all to central and south-eastern Europe, where Strabag Group is well established, is also being considered in the medium term.
In the area of advanced binary geothermal power plants, Exergy is the world's second largest ORC plant provider and can boast a project portfolio with around 450 MW of installed capacity.
Marco Frassinetti, sales director of Exergy International Srl, added that the company brings its mature technological competence into the cooperation, utilising the flexibility and efficiency of the Radial Outflow turbine the company has developed and produced.
“We see valuable opportunity to grow in the German market combining our expertise in binary technology with Strabag’s EPC (Engineering, Procurement & Construction) capabilities” said Mr Frassinetti.
For additional information: