storage

Construction of Pacific Green’s 373.5 MWh Sheaf Energy Park continuing according to schedule

Global energy storage company Pacific Green has recently completed site preparation and groundworks for its 249MW / 373.3MWh Sheaf Energy Park in Kent on schedule, paving the way for the arrival of the first 200+ equipment containers.
Construction of Pacific Green’s 373.5 MWh Sheaf Energy Park continuing according to schedule
Courtesy of PacificGreen.

Sheaf Energy Park is a large-scale battery energy storage system (BESS) that is currently under construction on behalf of asset owner Sosteneo, located on brownfield land at the site of the former Richborough coal-fired power station.

In conjunction with Pacific Green and Sosteneo’s now operational 100MW / 100MWh Richborough Energy Park, Sheaf will form part of a strategically significant UK clean energy storage and transmission hub which hosts vital connections for the Nemo Link interconnector with Belgium and Thanet Offshore Wind Farm.

Following completion of Factory Acceptance Testing (FAT), Sheaf has now taken delivery of 68 containers and installed the first of 34 housing the project’s Power Conversion Systems (PCS) – a crucial component for dynamic coupling of the BESS with the grid.

These PCS containers will be followed by 135 liquid cooled, LFP chemistry battery containers, to be shipped from supplier and installed in a just-in-time approach prior to energisation with the electrical grid.

Activity at the site is being conducted in line with robust safety and risk management protocols. Community engagement and biodiversity are also being prioritised, with key milestones including the appointment of a stakeholder engagement representative and biodiversity actions including removal of contaminated landfill left by the power station, rewilding of 10,000 square metres of land, and ultimately achieving biodiversity net gain of no less than 14.91 percent.

“Located at a former industrial site and with an excellent grid connection, Sheaf Energy Park will be a strategic asset for the UK’s energy grid – and in many ways is a true symbol of the energy transition” said Christo Hammes, Pacific Green’s Chief Operating Officer. “Coupled with Richborough Energy Park, this project embodies Pacific Green’s commitment to UK energy storage and is laying the foundation for future growth. We are pleased with progress to date, having hit a number of our key development milestones, and we are committed to maintaining dialogue with our stakeholders and the community as we bring the project through to commissioning next year.”

Pacific Green was retained to oversee the construction, operations and maintenance of Sheaf Energy Park following its sale to Sosteneo Fund 1 Holdco S.à.r.l. in December 2023. SSE Energy Supply Limited (SSE) will be responsible for providing optimisation services for a 10-year period from the start of commercial operations.

For additional information:

Pacific Green

Baterías con premio en la gran feria europea del almacenamiento de energía
El jurado de la feria ees (la gran feria europea de las baterías y los sistemas acumuladores de energía) ya ha seleccionado los productos y soluciones innovadoras que aspiran, como finalistas, al gran premio ees 2021. Independientemente de cuál o cuáles sean las candidaturas ganadoras, la sola inclusión en este exquisito grupo VIP constituye todo un éxito para las empresas. A continuación, los diez finalistas 2021 de los ees Award (ees es una de las cuatro ferias que integran el gran evento anual europeo del sector de la energía, The smarter E).