Scheduled for commissioning in late 2020, the new storage system, which represents an investment of around €15 million, will be based on Saft’s Intensium Max 20 High Energy solution and will comprise 11 integrated 2.3 MWh containers, designed and manufactured at Saft’s production site in Bordeaux.
“This project is part of Total’s strategy to develop the stationary energy storage solutions that are critical to the expansion of renewable energy, which is intermittent by nature. It will contribute toward the goal of increasing the share of renewables in France’s energy mix, while helping to stabilize the domestic power grid,” said Patrick Pouyanné, chairman and CEO of Total.
“Total’s involvement in the electricity segment continues to expand. With more than 40% of the storage capacities allocated, Total was the leading winner of the first call for tenders organized by RTE (France’s Electricity Transmission Network). This success was made possible thanks to the competencies of Total Flex, renewable energy aggregation expert, and Saft, the European leader in batteries for energy storage," he concluded.