This milestone marks the culmination of the G132-5.0 MW certification process and endorses the technological credentials of the turbine which is the most powerful made by Gamesa, generating 3 percent more power than the G128-5.0 MW turbine. This roughly equivalent to supplying 5,000 households per year.
The first G132-5.0 MW prototype was installed at the company’s R&D facility in Alaiz (Navarra) in April of last year. It is 186 metres tall and each of its blades is 64.5 metres long, making them the largest ever transported in Spain
For additional information: