wind

Nordex Group Receives Order in Brazil From Auren Energia

Brazil-based energy holding company Auren Energia has commissioned the Nordex Group to supply and install 19 N163/5.X turbines. The 112 MW order includes the service for the turbines for an initial period of 15 years, with several options to extend up to 30 years.
Nordex Group Receives Order in Brazil From Auren Energia
Courtesy of NREL.

The turbines are destined for the Cajuína 3 wind farm which is part of the Cajuína Wind Complex in the state of Rio Grande do Norte in the municipality of Lajes. The 19 turbines are due to be installed beginning of 2026 and will be supplied in an operating mode of 5.9 MW on 120-meter concrete towers. Commissioning is scheduled for autumn 2026.

In the last years, the Nordex Group already delivered and installed in total 120 N163/5.X turbines comprising 684 MW for the Cajuína 1 and Cajuína 2 wind farms.

Auren Energia (AURE3) is Brazil’s third largest energy producer and a leading energy trader in the Brazilian market, specializing in 100% renewable energy. The company operates in nine Brazilian states and owns 39 energy assets that produce wind, solar and hydroelectric power, with total installed capacity of 8.8 GW. 

Baterías con premio en la gran feria europea del almacenamiento de energía
El jurado de la feria ees (la gran feria europea de las baterías y los sistemas acumuladores de energía) ya ha seleccionado los productos y soluciones innovadoras que aspiran, como finalistas, al gran premio ees 2021. Independientemente de cuál o cuáles sean las candidaturas ganadoras, la sola inclusión en este exquisito grupo VIP constituye todo un éxito para las empresas. A continuación, los diez finalistas 2021 de los ees Award (ees es una de las cuatro ferias que integran el gran evento anual europeo del sector de la energía, The smarter E).