The 21 MW order for the Viinamäki project comprises five V150-4.2 MW turbine with a hub height of 175 meters, the highest ever in Vestas’ history. The 175-meter tower is the world’s tallest all-steel wind turbine tower, which is achieved through Vestas’ latest tower technology, Cable Stayed Towers. With this technology, Vestas can efficiently unlock greater wind potential at higher hub heights while easing logistic constraints.
“With the R&D collaboration on the Viinamäki project we are taking our already excellent and longstanding relationship with TuuliWatti to a whole new level”, said Nils de Baar, President of Vestas Northern and Central Europe. “Onshore wind is already one of the most competitive power generation sources and Viinamäki shows how innovations across the entire value chain enable Vestas to offer sustainable energy solutions that increase customer value.”
The contract includes supply, installation and commissioning of the wind turbines, as well as an Active Output Management 5000 (AOM 5000) service agreement beyond 25 years. Delivery of the wind turbines is expected to begin in the second quarter of 2019.